Future Homes Standard
In 2021, under the conservative government a consortium of experts led by the BRE were appointed to carry out a multi-year project to develop a replacement for the Standard Assessment Procedure (SAP). In December 2023 the consultation 'The Future Homes and Buildings Standards: 2023 consultation' was published along with the 'Home Energy Model: Future Homes Standard assessment' on the same day.
The intention is that this approach be used to replace the most recent SAP version 10.2 for the energy rating of new dwellings, though the approach for existing dwellings (RdSAP) was not explicitly discussed in the consultation. The update to RdSAP (RdSAP 10), initially expected in 2024 and now expected to be available in 2025, was anticipated to significantly improve on previous versions. It aims to have a number of upgrades, including new technologies, protocols for datacollection, detailed recommendations, and better carbon emissions assessments, which would then be incorporated into an EPC, and feed into other government funding schemes such as the Boiler Upgrade Service (BUS).
It is intended that from 2025 all new homes will comply with the Future Homes Standard. This standard uses what is called the Home Energy Model (HEM) and will be the primary tool used to demonstrate compliance during the building design and planning stages for homes. It is also expected that both SAP and RdSAP will be replaced by the Home Energy Model (HEM) in the future and used as the basis for calculating EPCs for new and existing buildings by 2026.
The Home Energy Model: Future Homes Standard assessment is a methodology designed to assess compliance with the 2025 Future Homes Standard (“FHS”). The Home Energy Model and FHS assessment together make up the Home Energy Model: FHS assessment. Both are still under development and will be implemented alongside the FHS in 2025.
To manage the broad range of data points or inputs that will be covered by the HEM, it is likely that the model will have to use a number of assumptions rather than inputting individual data for each project. These assumptions may range in relation to the purpose of the assessment, the occupancy patterns, localised weather patterns, links to other building standards, white goods, air tightness, ventilation, and so on. It is intended that these data points and assumptions, which may also expand with time, are simplified and included via assessment wrappers. The model is intended to be flexible enough to account for and allow for adjustments based on specific buildings while being simple enough to be workable.
[edit] Related articles on Designing Buildings
- BRE Group response to the Future Homes Standard consultation.
- BRE response to the green housing revolution.
- Building Beautiful Places plan.
- Building Better, Building Beautiful Commission interim report.
- Building Better, Building Beautiful Commission.
- Changes to Building Regulations Part F.
- Getting zero carbon done.
- Future Buildings Standard.
- Future Buildings Standard shortcomings raised.
- Future Homes Standard consultations.
- Green Housing Revolution.
- Home design prospects under the Future Homes Standard.
- Home Energy Model.
- Hybrid heat pump electric panel heating.
- Is hydrogen the heating fuel of the future?
- National Design Guide.
- Pilot programme for National Model Design Code NMDC.
- The effects of subframe systems on the overall thermal performance of external rainscreen walls.
- The EPC consultation in the context of changes to the NCM.
- Thermal bridging and the Future Homes Standard.
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Comments